Dallas / Fortworth (DFW) International Airport Project Management / Construction Management Support Services
Client:
Location:
Services:
Completion:
Keville provided services to DFW Airport’s Design, Code and Construction (DCC) Department under a Project Management / Construction Management Services contract as a sub-consultant to HNTB. This PM/CM contract focused on facility construction type projects with a total value of over $480 million.
Keville provided Quality Assurance/Inspection under this contract on many types of projects including new construction, renovations, repairs, upgrades, relocations and rehabilitations. The following table lists many of the projects our which Keville’s QA Manager and QA Inspectors provided their services. Some of our completed projects under this contract are as follows.
• DPS Headquarters ($56M)
• TEX Rail at Terminal B ($42M)
• Integrated Operations Center (IOC) ($44M)
• Facilities Consol., Ph 1 Roads/Utilities ($37M)
• Rehabilitate Landside Roadways, Ph 4A ($28M)
• Grand Hyatt Roof & Joint Sealant ($18M)
• E/W Potable Water Storage Tanks ($8.5M)
• Access Control Office Relocation ($7.6M)
• Term. B/E Pass. Boarding Bridge Gates ($5.7M)
• US Postal Office at Southgate Plaza ($2.2M)
• Chiller Plant Upgrades ($2.5M)
• Reconstruct 24th Ave ($3.6M)
• Landside Storm Sewer Repair ($3.4M)
• Terminal B Pavement Repair ($3.5M)
• Parking Canopy Replacements ($2.7)
• SE Quadrant Main Sanitary Sewer ($2.2M)
• Fire Station #5 HVAC System Replacement ($2.1M)
• Rental Car Center Restroom Renovation ($1.7M